PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued welding the tube steel at the top of the Main steel column Facing East (800x600).jpg Door frames delivery for the 1st floor Facing West (800x600).jpg Installing split wire above the cealing at the 2nd floor Facing West (800x600).jpg Main Sprinkler piping at the 1st Floor Facing North-East (800x600).jpg Metal Track (800x600).jpg Poured slab on deck at half of the 4th Floor Facing North-West (800x600).jpg Pouring concrete at half of the 4th Floor Facing North-West (800x600).jpg Welding beam clips at the 3rd Floor Facing East (800x600).jpg
Previous pageNext page Metal Track (800x600)
Metal Track (800x600)